Lexington Modern : On a Mission - 1

Lexington Modern : On a Mission - 1
The crew is renovating a home to be accessible for a young boy with muscular dystrophy.
24 分钟
2023年9月25日
Lexington Modern: Shore We Can - 2

Lexington Modern: Shore We Can - 2
Construction began on the Lexington project. A new energy code affects the construction.
24 分钟
2023年10月4日
Lexington Modern: The Big Dig - 3

Lexington Modern: The Big Dig - 3
A concrete block wall is built to connect the new mechanical space out front to the old.
24 分钟
2023年10月11日
Lexington Modern: Engineered for Accessibility - 4

Lexington Modern: Engineered for Accessibility - 4
A lally column is replaced by a larger ridge beam for an open kitchen and dining area.
24 分钟
2023年10月18日
Lexington Modern: Gone Geo - 5

Lexington Modern: Gone Geo - 5
Framing begins for a new zero-threshold sliding glass door. Geothermal is explained.
24 分钟
2023年10月25日
Lexington Modern: Reworked and Rewired - 6

Lexington Modern: Reworked and Rewired - 6
Geothermal pipes are run, wood blocking is installed, and receptacle boxes are replaced.
24 分钟
2023年11月1日
Lexington Modern: Ramping Up - 7

Lexington Modern: Ramping Up - 7
The original brick is repaired. A ramp is built, and a modern accessible house is toured.
24 分钟
2023年11月8日
Lexington Modern: Drop in the Gutter - 8

Lexington Modern: Drop in the Gutter - 8
A custom gutter is built. The neighbor's house, designed by the same architect, is toured.
24 分钟
2023年11月15日
Lexington Modern: Phased Out - 9

Lexington Modern: Phased Out - 9
A lesson on stucco is given, the siding is installed, and patio drainage is addressed.
24 分钟
2024年1月3日
Lexington Modern: Seven Layer Floors - 10

Lexington Modern: Seven Layer Floors - 10
Insulation and tile prep is in progress. A motorized multi-slide door is installed.
24 分钟
2024年1月10日
Lexington Modern: Electrical Bond - 11

Lexington Modern: Electrical Bond - 11
Electrical work for the elevator begins and the therapy pool is installed.
24 分钟
2024年1月17日
Lexington Modern: Upcycled - 12

Lexington Modern: Upcycled - 12
The elevator cab is built, and audio-visual technologies are explored for accessibility.
24 分钟
2024年1月24日
Lexington Modern: Install with Care - 13

Lexington Modern: Install with Care - 13
The new mechanical room is revealed. In-wall lights are installed at the front ramp.
24 分钟
2024年1月31日
Lexington Modern: All in the Family - 14

Lexington Modern: All in the Family - 14
The homeowners sit down for an interview about their son and Duchenne muscular dystrophy.
24 分钟
2024年2月7日
Lexington Modern: Judgement Day - 15

Lexington Modern: Judgement Day - 15
A final review of the geothermal system is done, and a blower door test is performed.
24 分钟
2024年2月14日
Lexington Modern: Accessible Made Modern - 16

Lexington Modern: Accessible Made Modern - 16
The accessible renovation of the mid-century modern home in Lexington, MA is complete.
24 分钟
2024年2月21日
Glen Ridge Generational: Multi-Generational - 17

Glen Ridge Generational: Multi-Generational - 17
A new project begins - an 1887 Victorian being renovated for multigenerational living.
24 分钟
2024年3月27日
Glen Ridge Generational: Vintage - 18

Glen Ridge Generational: Vintage - 18
Work begins on the 1887 Victorian to make it suitable for multigenerational living.
24 分钟
2024年4月3日
Glen Ridge Generational: Small But Mighty - 19

Glen Ridge Generational: Small But Mighty - 19
Termite damage is discovered. A high school student works as a framer on the project.
24 分钟
2024年4月10日
Glen Ridge Generational: QR Construction - 20

Glen Ridge Generational: QR Construction - 20
The new two-story addition is framed, and plumbing pipes are isolated from cold weather.
24 分钟
2024年4月17日
Glen Ridge Generational: Roughed In - 21

Glen Ridge Generational: Roughed In - 21
A trip is taken to the Empire State Building and the new plumbing system is discussed.
24 分钟
2024年4月21日
Glen Ridge Generational: Next Level Tight - 22

Glen Ridge Generational: Next Level Tight - 22
A custom jamb and threshold are built. Various water-resistive barriers are compared.
24 分钟
2024年4月28日
Glen Ridge Generational: A Breath of Fresh Air - 23

Glen Ridge Generational: A Breath of Fresh Air - 23
A new brick walkway and wood fiber insulation are installed. ERVs and HRVs are discussed.
24 分钟
2024年5月5日
Glen Ridge Generational: Tested and Approved - 24

Glen Ridge Generational: Tested and Approved - 24
A baseboard detail becomes a focal point, and a prefabricated shower niche is installed.
24 分钟
2024年5月15日



























