Super Tunnel
xivetv documentaries

Super Tunnel

Essai gratuit de XiveTV Documentaries

Des conditions s'appliquent

Super Tunnel delves into the immense logistical engineering and human challenges behind building the Elizabeth Line beneath London From massive tunneling operations to safeguarding historic structuresand doing it all while keeping the city runningthis series offers an indepth longform chronicle of one of Europes most ambitious infrastructure projects
1 saison
1 saison
TV-14 (DÉCONSEILLÉ AUX MOINS DE 14 ANS)
Saison 1
5 épisodes
  • 2. Tunnels Under the Thames

    2. Tunnels Under the Thames

    Crossrail teams tackle the complex and challenging feat of creating new tunnels beneath the River Thames The episode highlights efforts like rebuilding a Victorianera tunnel in the Royal Docks and draws parallels with the original Brunelera tunnelers through the involvement of a modernday British tunnelling family
    Crossrail teams tackle the complex and challenging feat of creating new tunnels beneath the River Thames The episode highlights efforts like rebuilding a Victorianera tunnel in the Royal Docks and draws parallels with the original Brunelera tunnelers through the involvement of a modernday British tunnelling family
    TV-PG (ACCORD PARENTAL SOUHAITABLE)
    59 min
  • 4. Elizabeth Line

    4. Elizabeth Line

    Over 10000 engineers and workers race to finish Londons Crossrail a £15 billion megaproject under the city Linda Miller leads the build of Farringdon Station battling fault lines flooding risks and tight space From floating tracks beneath the Barbican to modernizing Whitechapel the project culminates in the opening of the Elizabeth Line
    Over 10000 engineers and workers race to finish Londons Crossrail a £15 billion megaproject under the city Linda Miller leads the build of Farringdon Station battling fault lines flooding risks and tight space From floating tracks beneath the Barbican to modernizing Whitechapel the project culminates in the opening of the Elizabeth Line
    TV-PG (ACCORD PARENTAL SOUHAITABLE)
    59 min
  • 6. Test Run

    6. Test Run

    Follow the engineers technicians and train staff who are under pressure to complete their section of the project including building and fitting out 10 brand new stations learning to drive the new fleet of trains and testing the 21km twin tunnels beneath London in a bid to make it safe for the public If they fail to complete on time the delay will cost almost three million pounds a day
    Follow the engineers technicians and train staff who are under pressure to complete their section of the project including building and fitting out 10 brand new stations learning to drive the new fleet of trains and testing the 21km twin tunnels beneath London in a bid to make it safe for the public If they fail to complete on time the delay will cost almost three million pounds a day
    TV-PG (ACCORD PARENTAL SOUHAITABLE)
    59 min
  • 8. Deadlines

    8. Deadlines

    Deadlines loom larger than ever and the costs seem to increase by the day The Crossrail crew work on final test runs and overcome any last minute snags as quickly and efficiently as possible Opening preparations are starting to be made to launch in time for the Queens platinum jubilee
    Deadlines loom larger than ever and the costs seem to increase by the day The Crossrail crew work on final test runs and overcome any last minute snags as quickly and efficiently as possible Opening preparations are starting to be made to launch in time for the Queens platinum jubilee
    TV-PG (ACCORD PARENTAL SOUHAITABLE)
    59 min
  • 10. Under Pressure Over Budget

    10. Under Pressure Over Budget

    An army of 10000 workers have worked tirelessly to build a subway line underneath London Over 10 years and nearly £20 billion later the Crossrail crew have constructed Londons Super Tunnel Under pressure form the public and now £5 billion over budget workers get the project back on track to finish in time for the Queens jubilee
    An army of 10000 workers have worked tirelessly to build a subway line underneath London Over 10 years and nearly £20 billion later the Crossrail crew have constructed Londons Super Tunnel Under pressure form the public and now £5 billion over budget workers get the project back on track to finish in time for the Queens jubilee
    TV-PG (ACCORD PARENTAL SOUHAITABLE)
    52 min
  • Super Tunnel
    1 saison
    Super Tunnel delves into the immense logistical engineering and human challenges behind building the Elizabeth Line beneath London From massive tunneling operations to safeguarding historic structuresand doing it all while keeping the city runningthis series offers an indepth longform chronicle of one of Europes most ambitious infrastructure projects
    Créateurs et distribution
    Studio
    MagellanTV
    Avis
    1. 5 étoile
      0%
    2. 4 étoile
      0%
    3. 3 étoile
      0%
    4. 2 étoile
      0%
    5. 1 étoile
      0%
    Afficher tous les avis
    Avertissement relatif au contenu
    TV-14 (DÉCONSEILLÉ AUX MOINS DE 14 ANS)
    Les lumières clignotantes et stroboscopiques peuvent affecter les spectateurs photosensibles
    Audio
    English
    Sous-titres
    English
    En commandant ou en visionnant du contenu vidéo, vous acceptez nos Conditions d'utilisation. Commercialisé par Amazon.com Services LLC.

    Commentaires