Glen Aitken and his team from Cambridge, Ontario will use a 288-wheel extreme machine, called the Transporter to lift a massive bridge span off the ocean barge that carried it to New York from Alabama where it was built.Glen Aitken and his team from Cambridge, Ontario will use a 288-wheel extreme machine, called the Transporter to lift a massive bridge span off the ocean barge that carried it to New York from Alabama where it was built.